Site prep for the duck houses.  First we come in and excavate to  grade.  Then  4 inches of drain rock and 4 inches of road base.  The piles of sand go in the duck houses.  The white pipe is a rough outline of where the duck house go.

 

The first of 3 duck houses.
free templates