We need to run a new drain line under the concrete slab to tie into the drain line to the street.

This is under the bar where we need to jack hammer the concrete away. 

New drain line and "P" trap going in. We also had to move a electric line not pictured. 

What's left of a metal "P" trap and floor drain 

New trap and floor drain in. Packing down the new gravel in preparation for filling in with concrete. 

Concrete down and drying...The bar never needed to close as we worked around their open hours. 